2021 Road Program
The Department of Public Works is planning to pave the following streets this spring – Weirs Boulevard (roundabout to NASWA), Lakeside Avenue (Foster Ave to Centenary Ave), Shore Drive (Pump Station Road to 422 Shore Drive). Franklin Street, from Washington Street to Fairmont Street, is scheduled for water, drain, road and sidewalk reconstruction. The water work will begin this spring. Additionally streets will be added to the summer and fall schedule. Check back for updates or contact Krista Larsen, Assistant Public Works Director, at 528-6379 or KLarsen@laconianh.gov with any questions.